Introduction
Brief
Assessment
Design
Review
Pilot
Roll-out
Sign-off
Post Review
Process Review
Network Cabling Infrastructure Installation Pilot
The level of planning involved and the nature of this particular job did not allow for pilots or testing. The work had to follow the strict guidelines and schedules as detailed.